College Hall Addition and Renovation at Montclair State University

OWNER

Monclair State University

OWNER CONTACT

Dr. Susan Cole
Former MSU President

DELIVERY METHOD

Bid-Build

SIZE

130,000.00

COST

$43,000,000.00

COMPLETED

2020

OWNER

Hudson County Improvement Authority

CONTACT

Mr. Ted Domuracki, MAST Construction Services

TYPE

Design-Build Justice Complex

SIZE

575,000 SF

COST

$317,500,000.00

COMPLETED

Under Construction, Estimated Completion: 2024

The College Hall Addition and Renovation project completely life cycle renovated all the utility systems within the 112-year-old iconic historic building with dramatic and contextual sensitive architectural improvements to all the spaces and floors of this reimagined facility. Terminal Construction was successful in bringing the historical integrity of the building back by the restoration of elements such as uncovered brick walls, restored western hemlock wood finishes, tin ceilings, lighting fixtures as well as the antique 200-year-old mission bell in the tower above the College Hall Roofline.  This monumental building is now a one-stop shop for student services and the Red Hawk Central.

Related Projects

Scroll to Top